ENGLISH
Guangdu Avenue (Dawei Road to Sanqiang South Section) renovation project (Project Part 1)


The reconstruction of Guangdu Avenue starts from Dawei Road in the east and ends at Sanqiang South Road in the west (connecting with Shuangliu Square under the tunnel). The road grade is the main road of the city, and the designed traffic speed is 60Km/h. The road length is 2270.483m, the road red line is 50m wide, and the green belt is 10m on both sides. The construction content includes: road engineering, traffic engineering, water supply and drainage engineering, lighting engineering, landscape engineering, parking lot engineering and other related ancillary facilities.
Chengdu Airport City Development Group Co., Ltd.