Large road External winding (Double flow section) Road construction project (Project III)

Large road outside winding (double flow section) road construction project

In accordance with the municipal and county objectives and task requirements, the road construction project of Daqiao Road outer winding (double flow section) has basically completed the paving of the asphalt bottom layer of the road on December 31, 2015, and the main body of the road has basically completed, forming the traffic capacity. Under the personal guidance of the county leaders, the project solved the major factors restricting the progress of the project such as the problem of changing the stone from blasting to excavation, the problem of unqualified earth work, and the problem of dumping soil, especially in the last ten days or so, the management staff and workers often fought all night. Finally to the county party committee and the county government handed over a more satisfactory answer.

Minda underpass tunnel project

The underpass tunnel project of Minda Road in Southwest People's University is a municipal key livelihood project entrusted to our district by municipal Party Committee and municipal government. The construction includes the underpass tunnel project (810m), the tunnel supporting pump station and fire protection, monitoring and other facilities, 78.8 mu of ground landscape greening project, etc., the total investment of the project is about 289 million yuan. The funding source of the project is 40 million yuan from Minda, 40 million yuan from the district government, and the rest is subsidized by the municipal finance. The project aims to transform the ground road between the north and south campuses of Minda into a tunnel for vehicles to pass through. A bus harbor station is set in the tunnel, and a landscape square with national cultural characteristics and a slow walking system are built on the top surface of the tunnel, so as to effectively eliminate the traffic safety hazards of teachers and students on campus and improve the quality of Minda campus.

Chengdu high-tech comprehensive free Trade Zone (Shuangliu Park) freight yard and other supporting projects

The main construction contents of this project include the construction of a new railway freight yard, supporting 3.432 km of track, and the transformation of Gongxing and Qijiang stations. The special railway line is the first public railway freight line in Shuangliu District, including transport lines, container yards and related testing, metering and lifting facilities. The project is close to the comprehensive bonded B-type Park, within 3km of the West Port Development Zone, the International Biological City and many large enterprises around, and 5km from Shuangliu International Airport, which has obvious location advantages. After completion, it can start the China-Europe train and Pan-Asia train from Shuangliu, develop air and rail combined transport with the airport, and realize rail and public combined transport with the formed expressway network. The operation of the project basically realizes the concept of "Rongyuan-European +" and "multimodal transport", provides the top-level design of logistics for the enterprises in our district and radiating the surrounding areas, and realizes the deepening reform of logistics resources and takes off again.

Yixin Lake construction project

Yixin Lake covers an area of 2100 mu, will be for Yixin Lake wetland landscape, water conservancy engineering, water ecology engineering and other three aspects of construction, including wetland landscape engineering includes: walkway, landscape square, supporting management rooms and buildings and other supporting facilities; Water conservancy projects include: lake and wetland projects, flood canal projects, water lifting projects and matching gate projects; Water ecological engineering includes: the construction of ecological wetland, lake water ecosystem in the lake area, ecological agriculture experience area, etc. The completion of Yixin Lake is a leap in the overall economy of the Washington sector, integrating life, study, work and leisure, and will be a new business card of Chengdu city tourism.

There are 17 supporting roads in 10 resettlement communities

The project is divided into 17 roads, which are: Linjiang Liyuan Phase III A and B inter-district roads; Linjiang Liyuan Phase III B, C district road; Unity garden road; Yangliuhe Phase 3 south road; Yangliuhe III east side road; South road of Hongshi Expansion area (Shiye Road); Roads on the east and north side of the Hongshi Expansion Area (Industrial road); Phoenix home east side road; Yinggang Garden west side road; The road on the west side of the urban village resettlement community (Baihe Small Area); The road on the south side of the urban village resettlement community (Baihe Small District); Longdu Ying County north side road; Longdu Ying County east side road; Jinjiang Green House A, B district road; Jinjiang Green House A, B district south road; Jinhe Oasis south road; Golden River Oasis west side road. The total investment is 170 million yuan. At present, 11 articles have been completed, which brings convenience to the travel of surrounding citizens and beautifies the urban environment.