The project is located on the north side of high-speed railway Shuangliu West Station and the east side of Metro Shuangliu West Station, 15 minutes' drive from Shuangliu International Airport. The first phase of the project covers an area of about 141 acres, and the second phase covers about 99 acres. At present, the conceptual plan of the first phase of the project has passed the deliberation of the District Planning Committee, and the conceptual plan is being deepened design. The first phase of the project includes the first and last bus stations, long-distance passenger stations, taxi stations, transfer squares and office buildings, etc. After completion, it will form a five-in-one three-dimensional transportation hub with adjacent high-speed rail stations and subway stations, and achieve seamless transfer. It is expected that the construction will take 24 months in the first half of 2019.

项目概况  该项目包括住院楼、门诊医技楼、地下室及其附属设施,建筑面积约21万㎡。  区第一人民医院迁建项目效果图

The project includes inpatient building, outpatient medical technology building, basement and its ancillary facilities, with a construction area of about 210,000 square meters. District first People's hospital relocation project renderings

西南民族大学民大路下穿隧道工程是市委市政府交由我区实施的一项市级重点民生工程。建设包括下穿隧道工程(810m),隧道配套泵站及消防、监控等设施、78.8亩地面景观绿化工程等,工程总投资约2.89亿元。项目资金来源民大出资4000万元,区政府出资4000万元,其余由市财政补贴。本工程旨在将民大南北校区之间的地面道路改造为车行下穿隧道,隧道内设置公交港湾站,隧道顶面打造富于民族文化特色的景观广场及慢行

< 1...151617...22 >